Procedure
For closed tank applications without a bulb well, use the FTG13A-600R
packing nut.
-
Put the parts over the support tube section of the element.
-
Place the bulb in the tank.
-
Install the 1/2 in. NPT adapter in the tank opening and tighten it.
-
Screw the packing nut with the retaining washers and packing into the
adapter.
Figure 1. Part No. FTG13A-600R packing nut assembly.