Reboot button - Verasys - LC-SBH200-0 - LC-SBH200-0E - LC-SBH200-0LA - LC-SBH200-0S - Supervisory Device - SBH200

Verasys Smart Building Hub (SBH) Installation Guide SBH200

Brand
Verasys
Product name
SBH200
Document type
Installation Guide
Part number
24-10737-00237
Document revision
C
Revision date
2020-01-17
Language
English

The SBH has a REBOOT button beside the RESET button. The SBH has a super capacitor that, when charged, keeps the SBH powered up for 30 seconds. To force a reboot immediately, press the REBOOT button.