Procedure
To design a COBP Zoning System, complete the following steps:
- Determine the number and location of zones.
- Size the zone dampers.
- Size the central unit.
- Plan the duct system design.
- Select air diffusers.
- Size the bypass dampers.
- Locate the static pressure sensor and probe.