Signing off - PENN Controls - LIT-12013314 - PC10 - RMZ-1214-E10 - RMZ1214E11-NT1 - RMZ1214E11-NT3 - RMZ1214E20 - RMZ1214E61-DS1 - RMZ1214R10-EU - RMZ1214R10-UK - RMZ1214R10-US - RMZ1218C10-EU - RMZ1218C10-UK - RMZ1218C10-US - RMZ1218C40-EU - RMZ1218C40-UK - RMZ1218C40-US - PENN Connected - PENN Connected PC10

PENN Connected PC10 Install and Commissioning Guide

Product
Refrigeration > Gateways > PENN Connected PC10
Building Automation Systems > Building Automation Systems > PENN Connected PC10
Network and Communications > Gateways and Routers > PENN Connected PC10
Document type
Commissioning Guide
Document number
LIT-12013314
Revision date
2021-08-25

To conclude the commissioning process, on the app, tap SIGN OFF. The following options display:

Procedure

  • Sign off with X units: Submit the commissioned units for the current site.
  • Sign off and view: Submit the commissioned units for the current site, and view them on the PENN Connected platform.
  • Sign off and add new: Submit the commissioned units for the current site, and commission a new site.
  • Cancel: Cancel the submission of the current site.