Installing the repeaters - PENN Controls - LIT-12013314 - PC10 - RMZ-1214-E10 - RMZ1214E11-NT1 - RMZ1214E11-NT3 - RMZ1214E20 - RMZ1214E61-DS1 - RMZ1214R10-EU - RMZ1214R10-UK - RMZ1214R10-US - RMZ1218C10-EU - RMZ1218C10-UK - RMZ1218C10-US - RMZ1218C40-EU - RMZ1218C40-UK - RMZ1218C40-US - PENN Connected - PENN Connected PC10
PENN Connected PC10 Install and Commissioning Guide
- Product
- Network and Communications > Gateways and Routers > PENN Connected PC10
- Refrigeration > Gateways > PENN Connected PC10
- Building Automation Systems > Building Automation Systems > PENN Connected PC10
- Document type
- Commissioning Guide
- Document number
- LIT-12013314
- Revision date
- 2021-08-25
Procedure
-
Identify appropriate locations for the repeaters, and install
them at a height that prevents interference from staff and customers.
-
Mount the repeaters with or without brackets. Secure the repeaters with screws,
tie-wraps, or double-sided tape.
-
Connect the repeaters to a power supply; the repeaters flash blue on
connection.