Pre-installation survey - PENN Controls - LIT-12013314 - PC10 - RMZ-1214-E10 - RMZ1214E11-NT1 - RMZ1214E11-NT3 - RMZ1214E20 - RMZ1214E61-DS1 - RMZ1214R10-EU - RMZ1214R10-UK - RMZ1214R10-US - RMZ1218C10-EU - RMZ1218C10-UK - RMZ1218C10-US - RMZ1218C40-EU - RMZ1218C40-UK - RMZ1218C40-US - PENN Connected - PENN Connected PC10

PENN Connected PC10 Install and Commissioning Guide

Product
Refrigeration > Gateways > PENN Connected PC10
Building Automation Systems > Building Automation Systems > PENN Connected PC10
Network and Communications > Gateways and Routers > PENN Connected PC10
Document type
Commissioning Guide
Document number
LIT-12013314
Revision date
2021-08-25

Before you install and commission the PC10, perform a pre-installation survey on the premises to determine the optimal placement of the hardware.