Materials and Special Tools Needed - PEAK - PK-OEM1810-0 - PK-OEM1820-0 - Smart equipment controller - PEAK OEM 18 24 Volt SMART Equipment Controller

PEAK OEM 18 24 Volt SMART Equipment Controller Installation Guide

Brand
PEAK
Product name
PEAK OEM 18 24 Volt SMART Equipment Controller
Document type
Installation Guide
Part number
24-10143-934
Document revision
C
Revision date
2021-03-26
Product status
Active
Language
English
  • Three fasteners appropriate for the mounting surface (M4 screws or #8 screws)
  • One 20 cm (8 in.) or longer piece of 35 mm DIN rail and appropriate hardware for DIN rail mount (only)
  • Small straight-blade screwdriver for securing wires in the terminal blocks