Installation - PEAK - PK-OEM1810-0 - PK-OEM1820-0 - Smart equipment controller - PEAK OEM 18 24 Volt SMART Equipment Controller

PEAK OEM 18 24 Volt SMART Equipment Controller Installation Guide

Product name
PEAK OEM 18 24 Volt SMART Equipment Controller
Document type
Installation Guide
Document revision
C
Revision date
2021-03-26
Product status
Active

Observe these guidelines when installing a PEAK SMART Equipment controller:

  • Transport the controller in the original container to minimize vibration and shock damage.
  • Verify that all parts shipped with the controller.
  • Do not drop the controller or subject it to physical shock.