For further information on how to set up a field controller to work with the ZFR1811 Router, refer to the following documents:
- FEC16 Field Equipment Controller Installation Instructions (Part No. 24-10143-136)
- FEC26 Field Equipment Controller Installation Instructions (Part No. 24-10143-144)
- IOM17 and IOM27 Input/Output Modules Installation Instructions (Part No. 24-1044-76)
- IOM37 Input/Output Module Installation Instructions (Part No. 24-1044-84)
- IOM47 Input/Output Module Installation Instructions (Part No. 24-1044-92)
- VMA16 Series Variable Air Volume Controllers Installation Instructions (Part No. 24-10143-20)
Some connections require the use of the ZFRCBL wire harness. To use the ZFRCBL wire harness, make the connections as shown in Figure 4 and Figure 5. For more information on using the ZFRCBL accessory, refer to the Wireless Commissioning Converter Installation Instructions (Part No. 24-10108-2).