Data protection battery related problems - Metasys - LIT-1201519 - MS-NAE35xx-2 - MS-NAE45xx-2 - MS-NAE5510-2U - MS-NAE5510-3U - MS-NAE551S-2 - MS-NAE55xx-3 - MS-NCE25xx-0 - MS-NXE85SW-x - Supervisory Device - NAE35 Network Automation Engine - NAE45 Network Automation Engine - NAE55 Network Automation Engine - NAE85 Network Automation Engine - NCE25 Network Control Engine - 11.0

NAE Commissioning Guide

Brand
Metasys
Product name
NAE35 Network Automation Engine
NAE45 Network Automation Engine
NAE55 Network Automation Engine
NAE85 Network Automation Engine
NCE25 Network Control Engine
Document type
Commissioning Guide
Document number
LIT-1201519
Version
11.0
Revision date
2022-02-09
Language
English

Improper shipping, handling, installing, charging, or disconnecting of the NAE data protection battery may also result in flash memory corruption and data loss.

To avoid problems related to the data protection battery, refer to the Setup and Adjustment sections in the appropriate network engine installation instructions for proper procedures for connecting, charging, and disconnecting the data protection battery before you connect supply power to the NAE. These instructions include:

  • NCE25 Installation Instructions (Part No. 24-10143-63)
  • NAE35/NAE45 Installation Instructions (Part No. 24-10050-6)
  • NAE55/NIE55 Installation Instructions (Part No. 24-10051-43)
  • NIE29 Installation Instructions (Part No. 24-10143-594)
  • NIE39/NIE49 Installation Instructions (Part No. 24-10050-103)
  • NIE59 Installation Instructions (Part No. 24-10143-608)