The N1 Migration Flowchart (Figure 1 and Figure 2) describes the sequence of steps necessary to successfully migrate an N1 Network into the Metasys system using an NIE. These steps allow you to configure and prepare the N1 Network, import the N1 objects either by using Auto Discovery or using the N1 Migration Tool, and migrate the N1 Network features, including Schedules, Calendars, Alarm, Point, Trend, and Totalization configurations.
Figure 1. N1 Migration Flow Chart (Part 1 of 2)
Figure 2. N1 Migration Flowchart (Part 2 of 2)