Shed Times - Metasys - LIT-12011288 - Software Application - Metasys Building Automation System - 6

DLLR Technical Bulletin

Product
Building Automation Systems > Building Automation Systems > Metasys Building Automation System
Document type
Technical Bulletin
Document number
LIT-12011288
Version
6
Revision date
2013-10-15

To establish shed times, determine the following:

  • How long can the load be off (or in its Shed State, if specified as other than Off) without significant loss to facility performance?

  • Once released, how long before the load can be considered for shedding again?

  • Should a Comfort Override be scheduled to prevent shedding during critical times of the day?