Installation checklist - Johnson Controls - LIT-12014272 - Valve - Venturi Valve

Venturi Air Valve with UVM1000 Installation Guide

Product
Valves and Actuators > Valves > Venturi Valve
Document type
Installation Guide
Document number
LIT-12014272
Revision date
2023-03-10
Data
  • Project information
  • Submittals
  • Manuals for product
Tools
  • Wire strippers
  • Flat screwdriver set with different sized drivers
  • Phillips screw driver with different sized drivers
  • Small vice grips
  • Channel locks
  • Needle nose pliers
  • Crescent wrench
  • Nut driver set
  • Butane or electric soldering iron
  • Fine tip markers
Adherents
  • Solder
  • Electrical tapes
  • Duct tape
  • Foil tape
  • ASHRAE approved duct sealant
Electronics and components
  • Cell phone
  • Digital camera
  • Flashlight
  • Digital volt meter
  • DC and AC voltmeter
  • DC and AC ammeter
  • Resistance measurement with tone
  • Extra terminal connectors
  • Wire labels
  • Laptop with Windows OS and a free USB port
  • USB to DB9 male cable
  • Universal Valve Module (UVM) Configuration Tool installed
Safety
  • Ladder
  • Arrest harness
  • Safety glasses
  • Hard hat or bump cap
  • Steel toe cap shoes
  • Cut-resistant gloves