This summary reports the dispatch failures when the Plant Optimizer is not able to solve for a feasible solution for a given 15-minute period.
The reasons for dispatch failures are as follows:
- Communication loss with CUP-NAE\BAS.
- One or more BAS controller is offline.
- Not enough data to pass the dispatch due to unavailable equipment or operator overrides.