About this task
Figure 7 shows the sequence of operations for commissioning a WNC1820 Series Wireless Field Bus System, which is described in more detail in the rest of this section.
Figure 1. FX-ZFR Pro System Commissioning Sequence of Operations

Figure 7 shows the sequence of operations for commissioning a WNC1820 Series Wireless Field Bus System, which is described in more detail in the rest of this section.