Use this document to perform the following procedures:
- Sign and assign certificates
- Configure a BACnet/SC network
- Create a station to station BACnet/SC connection
This document describes how to create a BACnet/SC network with the
following configuration:
- The FX90 Supervisory Controller as the primary hub
- The F4-SNC Supervisory Controller as the failover hub
- Facility Explorer IP equipment controllers as nodes
Note:
You can configure any Facility
Explorer supervisory controller as the primary hub or secondary hub in your
BACnet/SC network.