  1. In the primary hub station, navigate to Drivers > BacnetNetwork > Bacnet Comm > ScHubPort > Link > HubFunction > Connections.
  2. If the connections are successful, the connection appears as ConnectionX where X is the connection number in the order that connections were made.
  3. In each connection, confirm that State and Sub State are connected.
    Note: Do no rename connections. When you change display names of connections, use Set Display Name.