This section details procedures for signing and assigning certificates, configuring a BACnet/SC network, and creating a station to station BACnet connection.
Before you begin these procedures, ensure the following requirements are
in place:
- All devices must be on a common network.
- The equipment controllers must be present in the F4-SNC's archive when viewed in JCT.