You can configure the FX90 Supervisory Controller to automate various functions in a facility based on a time schedule:
  • Determine the expected occupancy periods
  • Start or stop HVAC equipment
  • Turn lights on and off

You can link any writable point in the FX90 Supervisory Controller system database to a schedule. The scheduler interface provides a visually intuitive method for you to configure the daily, weekly, and exception or holiday schedules.