About this task
Important: Before making power terminations, de-energize the 24 V power source. Do not restore power until completing all other mounting and wiring.
Important: A grounding point must be present nearby.
Procedure
- Install the included earth ground wire to the controller's earth ground spade lug, and terminate the other end to a nearby earth ground.
- Unplug the controller's 2-position power connector plug and terminate the 24 V supply source (AC or DC) to the connector. Leave the connector unplugged.